Operator record
GED. Mechanic. First time offshore, survived the storm.
The proof is the work: offshore sailing, field operations, fabrication, and software built under constraint.
Operator record
The proof is the work: offshore sailing, field operations, fabrication, and software built under constraint.
Receipts

UK and France, 2025. CSM needed someone on the ground for Fastnet logistics. Fredericton to London, rail to Southampton, ferry to Cherbourg, three oversized suitcases, storage sorted, transfer complete, home the following Sunday.

Thailand, 2023. Inventory flow for a resort development built partly from shipping containers. Vendor network, tracking software, scooter imports, rerouting around armed rebel activity, and the credit card returned clean.

North Atlantic, February 2016. First time offshore, two-man crew, 75 knot sustained wind, 90+ knot gusts, waves over 30 ft, four days of storm, then nine more days to Antigua.
Built record
Trust rail
Offshore experience shaping the marine fabrication lane.
A practical proof point from the operator record.
A practical proof point from the operator record.
A practical proof point from the operator record.
A practical proof point from the operator record.