Stabilization · Tactical · Resource · eXecution
Field engineering when the normal plan has already failed.
Solo-operator deployment, project rescue, cross-border logistics, fabrication, and continuity support for high-pressure work.
Stabilization · Tactical · Resource · eXecution
Solo-operator deployment, project rescue, cross-border logistics, fabrication, and continuity support for high-pressure work.
Use it when
A key person leaves, the plan collapses, or the timeline stops matching the stakes.
Parts, mounts, brackets, fixes, and prototypes that need to happen near the failure.
Race prep, shore support, logistics, and equipment continuity around boat movement.
Inventory, AI workflow, automation, and communication tools when the situation calls for it.
Pricing

$1,200 CAD/day, 2 day minimum. Travel and per diem billed at cost.

$5,500 CAD/week. Full embed with a race team for pre-race through post-race.

$18,000 CAD/month. Two to twelve week embedded field engineering.

From $4,000 CAD/month. Three month minimum.
Start
If the problem can be handled as normal fabrication, I will route it that way.
If it needs an embedded operator, travel and per diem stay visible instead of hidden inside fuzzy pricing.
Deployment inquiry
Tell me the port, the timeline, the failure mode, and who has authority on site. I reply within one business day. For same-day emergencies, email directly and mark urgent.