Boat prep, printer integration, gear testing, and where the campaign stood heading into spring.
Category: Campaign. Date: 2026-03-12. This is part of the 3D3D archive of field notes, fabrication writing, and campaign updates.
Campaign · 2026-03-12
Boat prep, printer integration, gear testing, and where the campaign stood heading into spring.
5 min
Boat prep, printer integration, gear testing, and where the campaign stood heading into spring.
Category: Campaign. Date: 2026-03-12. This is part of the 3D3D archive of field notes, fabrication writing, and campaign updates.